Backyard with Pool and Outdoor Kitchen
- Phase 1: Site Analysis & Staking. We physically stake out the pool, kitchen, and the path of the Utility Spine based on the initial diagnostic. All stakeholders must sign off on this physical layout before any excavation.
- Phase 2: Foundational Work. This is the most critical step. The pool shell is excavated, and the concrete footings for the kitchen island are poured simultaneously. The trench for the Utility Spine is also dug at this time. This ensures all foundational elements are integrated and settled uniformly.
- Phase 3: Rough-in of the Utility Spine. All electrical conduits, gas lines (pressure-tested), and water/drainage pipes are laid within the spine. I insist on a photographic record of this stage for future reference.
- Phase 4: Hardscaping and Structure. The pool decking and patio are installed, leaving the kitchen island base and the Utility Spine cover accessible. The structure for the outdoor kitchen is then built on its footing.
- Phase 5: Appliance and Finishing Installation. The 316L grade appliances are installed and connected to the utility stubs. Countertops are fitted. All connections are tested for leaks and proper function.
- Phase 6: Lighting and Systems Commissioning. The final lighting fixtures are installed and a full systems stress test is performed—running the grill, all lights, and the pool pump simultaneously to ensure the electrical load is balanced and no breakers trip.