Eco Pavers
- Subgrade Compaction & Geotextile: The native soil is compacted to 95% Standard Proctor Density. Then, a non-woven geotextile fabric is laid down. This is a critical step many skip; it prevents the larger base aggregate from being pushed down into the soil over time, which would reduce the system's storage capacity.
- Base Reservoir Course: This is the workhorse. I exclusively use a clean, crushed angular stone, typically an ASTM No. 57 stone, laid in a 4 to 12-inch layer depending on the percolation test results and expected load. The angular shape is key, as it interlocks for stability, unlike rounded river rock.
- Bedding Course: This is a finer, 1.5-inch layer of ASTM No. 8 aggregate. Its purpose is to provide a smooth, level bed for the pavers. Using sand here is a catastrophic error I've had to correct countless times; sand will eventually clog the entire system from the top down.
- Joint Filler Aggregate: The same ASTM No. 8 stone is used to fill the joints between the pavers. It's crucial to resist the urge to use polymeric sand. Polymeric sand hardens and creates an impermeable seal, completely defeating the purpose of an eco paver system.
- Excavate with Precision: We excavate to the exact depth required by the design, ensuring a consistent base thickness across the entire project.
- Compact in Lifts: The ASTM No. 57 stone base is added in 4-inch "lifts." Each lift is compacted with a plate compactor until it is fully stable before the next is added. This prevents hidden, uncompacted zones that lead to future sinking.
- Screed the Bedding Course: We use screed rails to ensure the ASTM No. 8 bedding course is perfectly level to a tolerance of 1/8 inch over 10 feet. This ensures the final paver surface is smooth and free of trip hazards.
- Set Pavers and Consolidate: Pavers are placed, not pushed, into the bedding course. After placement, we run a plate compactor over the pavers to settle them into the bedding stone and achieve final interlock.
- Sweep and Consolidate Joint Stone: The ASTM No. 8 joint aggregate is swept into the joints until they are full. A final pass with the compactor locks this stone into place, creating the final, stable permeable surface.