Outdoor Grill With Cabinet
- Foundation Integrity Check: Before unboxing, ensure the patio or deck surface is perfectly level. I use a 4-foot level to check this. An uneven base puts continuous torsional stress on the cabinet frame, guaranteeing door and drawer misalignment over time.
- Seam Sealing Application: During assembly, I apply a thin bead of high-temperature food-safe silicone to all interior panel seams. This is a crucial step most installers skip. It prevents moisture and grease from seeping into the joints, which is a primary source of internal corrosion.
- Fastener Torque Specification: Do not overtighten the fasteners. This can dimple the stainless steel and create stress points. I use a torque wrench set to the manufacturer's specification or a standard 15-20 in-lbs for most small-diameter stainless steel bolts.
- Post-Assembly Surface Treatment: Once assembled, the final step is to clean the entire unit with a stainless steel cleaner and then apply a stainless steel protectant film or polish. This removes any iron deposits from the manufacturing process and provides a barrier against environmental contaminants.