Pool Covers Hillsborough County FL
Swimming pool covers are vital for keeping a clean, safe, and efficient swimming pool. They cut down on cleaning time, reduce energy costs by maintaining water temperature, boost safety by stopping unauthorized access, and maintain water levels by preventing evaporation. Using a pool cover keeps your pool in top condition and ready for use.
Swimming pool covers are vital for keeping a clean, safe, and efficient swimming pool. They cut down on cleaning time, reduce energy costs by maintaining water temperature, boost safety by stopping unauthorized access, and maintain water levels by preventing evaporation. Using a pool cover keeps your pool in top condition and ready for use.
-
Phase 1: Pre-Installation Analysis
- Surface Cure-State Verification: For new or refinished plaster, gunite, or pebble pools, I mandate a minimum 28-day cure time with no cover usage. This allows the majority of calcium hydroxide to off-gas naturally.
- Sanitizer Volatility Test: We analyze the pool's chemical regimen. Pools using liquid chlorine or calcium hypochlorite have different off-gassing profiles than those with salt chlorine generators. This dictates the required VTR of the cover material.
- Debris Load Assessment: A high load of fine organic debris (like pollen) might point toward a mesh cover that allows water through but blocks solids, preventing a "swamp" from forming on top of a solid cover.
-
Phase 2: Material and System Selection
- Solid Safety Covers (Low VTR): Best for long-term winterization and safety, but require a strict protocol of removing the cover for at least 12 hours after any chemical shock.
- Mesh Safety Covers (High VTR): My preferred choice for active, in-season use in pools with high chemical turnover. They allow gases to escape, preventing chloramine lock, but do allow some silt and UV light to pass through.
- Automatic Covers: The convenience factor is high, but the track and motor systems are highly susceptible to corrosion from trapped gases. I specify marine-grade lubricants and a mandatory "airing out" period of 1-2 hours daily.