Terracotta Pavers Near Me
- Excavation and Geotextile Fabric: We first excavate to the required depth for our region and lay a permeable geotextile fabric. This is a critical step to prevent the sub-base aggregate from mixing with the subsoil over time, which maintains the base's structural integrity.
- Compacted Aggregate Base: I mandate a minimum of 6 inches of compacted ¾-inch clean crushed aggregate, compacted in 2-inch lifts with a plate compactor. Each lift must be checked for proper compaction and grade.
- Bedding Sand: A precisely screeded 1-inch layer of coarse concrete sand provides the final leveling bed for the pavers. This is not the place for stone dust, which retains too much moisture.
- Paver Installation: Pavers are set by hand and adjusted for alignment. This is where craftsmanship becomes paramount.
- Jointing and Final Compaction: We use a high-quality polymeric sand swept into the joints. This sand hardens to lock the pavers in place and inhibit weed growth. A final pass with the plate compactor (using a protective mat) seats the pavers firmly.
- Curing and Sealing: The pavers must be perfectly clean and dry for at least 48 hours before any sealer is applied. Applying sealer to a damp paver traps moisture, which is the primary cause of sealer failure and efflorescence.